ATE AIRCRAFT MAINTENANCE HANGAR
Client: Aircraft Turnaround Engineering
Location: Cairns, Qld
Steel Tonnage: 160t steel & 2900m² Aramax Roof Cladding
Scope: CSF was engaged to project manage, detail, fabricate, paint and install the steel and Aramax roof sheeting.
The hangar consisted of 72m clear span pipe trusses as well as custom-made 760mm diameter x 20mm thick circular columns.
All painting was completed in-house within CSF’s large fully enclosed painting facility.
