Facebook Pixel

CSF Industries

ATE Aircraft Maintenance Hangar

ATE AIRCRAFT MAINTENANCE HANGAR

Client: Aircraft Turnaround Engineering

Location: Cairns, Qld

Steel Tonnage: 160t steel & 2900m² Aramax Roof Cladding

Scope: CSF was engaged to project manage, detail, fabricate, paint and install the steel and Aramax roof sheeting.

The hangar consisted of 72m clear span pipe trusses as well as custom-made 760mm diameter x 20mm thick circular columns.

All painting was completed in-house within CSF’s large fully enclosed painting facility.