CORDRILLA MINE COAL HANDLING CONVEYORS
Client: Thiess Sedgman Joint Venture
Address: Moranbah, CQ
Steel Tonnage: 250t
Scope: CSF was engaged to project manage, fabricate, paint and deliver to site.
Prior to delivery CSF was responsible for the pre-assembly of the conveyors. This task included handrails, grating, fire piping, fire hose reels, light poles and
conveyor rollers.
All of the conveyors were oversized (4.5m wide x 2m high x 24m to 31m long) and required police escorts to site.