NQ STADIUM LINK BRIDGE
Client: BESIX Watpac
Location: Townsville, Qld
Steel Tonnage: 94t
Scope: CSF was engaged to project manage, steel detail, fabricate, paint and install a 56.2m clear span bridge consisting of 94t of structural steel.
The bridge was oversize in length, width and height and in total was 5.8m wide and 5.52m high. Components of the bridge were fabricated in oversized panels, transported to site and preassembled into 3 separate bridge structures.
The pre-assembled structures were lifted into position and site welded together. All works were undertaken over a live Queensland Rail corridor.
